McDADE ISD - PRIMARY AND SECONDARY CAMPUS OSSF (REBID)

Construction of a new On-Site Sewage Facility

Status

Accepting Bids

Prebid Date 4/9/25 3:30pm
Bid Date 4/23/25 2:00pm

Company & Contacts

Reliance Architecture
Saraya Sadaat  
5127587660

Location

Secondary Campus: 156 Marlin St, McDade, TX 78650

ESTIMATED PROJECT BUDGET: $850,000 for both campuses.

SCOPE OF WORK

Construction

a. Provide all construction services necessary to implement the design approved by BASTROP COUNTY.

b. Coordinate schedule with the district to avoid interference with school activities and testing. Direct all field activities, safety, and quality control; prepare construction schedules; manage the project safety program; and provide appropriate project permits and reviews.

c. Procure all required equipment, subject to District approval.

d. Coordinate tie-ins and shutdowns that disrupt the regular wastewater; coordinate all these activities and present a schedule detailing these activities. Contractor shall be solely responsible for providing adequate and appropriate work- arounds to avoid process disruptions and shall not be entitled to any compensation for delays or interference because of actions taken by the district to maintain safe and adequate wastewater generation during construction.

e. Integration of all processes and associated equipment into the facility SCADA system. If required.

f. Complete construction and testing of pipeline assets to deliver finished wastewater to disposal site.

g. Coordinate start-up of all components of the Project. District personnel will be trained by the Proposer or designated manufacturer’s representative in the operation of all treatment processes and related equipment. Proposer will be responsible for working with equipment vendors and chemical suppliers to determine the most appropriate chemical dosages.

h. Provide for the operations and maintenance of the Facilities for not less than one year (including the minimum 6 months of training for Owner staff) following commissioning.

Post Construction Phase

a. Prepare as-built documents.

b. Assist in project closeout and establish warranties and guarantees.

For Plan Room Assistance:
Adelaide Powell, Digital Services Coordinator
Miller Imaging & Digital Solutions
Ph.: 512-381-5289 (Direct)