Austin ISD requests Competitive Sealed Proposals for the following project:
IMPORTANT HUB INFORMATION:
AISD HUB Program is in effect for this project.
See the HUB Compliance Guidelines in the Project Manual for complete information.
SCOPE OF WORK:
The Project consists of removal and replacement of the membrane roofing system with all associated insulation and flashing, repairs to EIFS walls above the roof level, replacement of rooftop HRU’s at the Admin area, and structural modifications associated with the HVAC replacement.. AISD shall have the right under the contract to assess liquidated damages for and not limited to performance and schedule delays beyond substantial completion.
ALTERNATE SCOPE: To the extent that funding permits, a limited number of the existing classroom HVAC systems (Water Source Heat Pumps) will be removed and replaced with DX heat pump split systems, including repair of interior finishes. Refer also to Section 012300 – Alternates.
ESTIMATED PROJECT BUDGET: $3,300,000
BID DOCUMENTS:
PDF (Download): No cost.
ALL FILES for this project may be downloaded from the Current Full Set folder. The files shown in the subfolders are the same as those shown in the Current Full Set folder.