BROWNWOOD ISD - BROWNWOOD MS - LOCKER ROOM RENOVATION [ADD-03]
Teinert Construction requests Subcontractors and Materials Suppliers for the following project:
SCOPE OF WORK:
In general, the project consists of MIDDLE SCHOOL LOCKER ROOM RENOVATION which includes but is not limited to: utility work, concrete walks, concrete slab repair, single ply roofing, steel studs and drywall, masonry, aluminum, hollow metal doors, aluminum windows, electrical, plumbing, and HVAC.
Interior finishes include but are not limited to: steel studs and drywall, ceramic tile, epoxy flooring, paint, acoustical ceiling, millwork, casework, expansion joint covers, marker wall, fire extinguishers and cabinets, toilet partitions, toilet accessories, metal lockers, plaque, identifying devices, and window blinds.
ESTIMATED PROJECT BUDGET: Not Provided
BID DOCUMENTS:
PDF (Download): No cost.
ALL FILES for this project may be downloaded from the Current Full Set folder. The files shown in the subfolders are the same as those shown in the Current Full Set folder.