AISD 22CSP055 - SUMMIT ES - RENOVATIONS [ADD-01 ADD-02 ADD-03]
Austin ISD requests Competitive Sealed Proposals for the following project:
IMPORTANT HUB INFORMATION:
AISD HUB Program is in effect for this project.
See the HUB Compliance Guidelines in the Project Manual for complete information.
SCOPE OF WORK:
Replace Existing aged HVAC equipment with new equipment
1.5.1. Architectural: Add architectural screen around new rooftop HVAC unit
1.5.2. Roofing: Roof curb and weather sealing for new rooftop HVAC unit
1.5.3. Civil: N/A
1.5.4. Plumbing: N/A
1.5.5. HVAC: Replace 3 existing water source heat pumps and 11 console ground source heat pumps. Renovations to existing fluid cooler.
1.5.6. Electrical: Electrical work to accompany new HVAC units. Electrical renovations to existing fluid cooler.
1.5.7. Structural: Structural work for new rooftop HVAC unit. Replace existing fluid cooler supports.
ESTIMATED PROJECT BUDGET: $512,652
BID DOCUMENTS:
PDF (Download): No cost.
ALL FILES for this project may be downloaded from the Current Full Set folder. The files shown in the subfolders are the same as those shown in the Current Full Set folder.